useful load factor

useful load factor
коефіцієнт корисного навантаження (на крило)

Англійсько-український словник авіаційних термінів / Уклад.: Р.О. Гільченко. - К.: НАУ. 2009.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Load profile — In electrical engineering, a load profile is a graph of the variation in the electrical load versus time. A load profile will vary according to customer type (typical examples include residential, commercial and industrial), temperature and… …   Wikipedia

  • Factor analysis — is a statistical method used to describe variability among observed, correlated variables in terms of a potentially lower number of unobserved, uncorrelated variables called factors. In other words, it is possible, for example, that variations in …   Wikipedia

  • Load following power plant — A load following power plant is a power plant that adjusts its power output as demand for electricity fluctuates throughout the day. Load following plants are in between base load and peaking power plants in efficiency, speed of startup and… …   Wikipedia

  • factor analysis — A family of statistical techniques for exploring data, generally used to simplify the procedures of analysis, mainly by examining the internal structure of a set of variables in order to identify any underlying constructs. The most common version …   Dictionary of sociology

  • Factor of adhesion — In railroad engineering, the factor of adhesion of a locomotive is the weight on the driving wheels divided by the starting tractive effort. This is an important statistic, because obviously extra power is pointless if there s not enough traction …   Wikipedia

  • Power factor — For other uses, see Power factor (pistol). The power factor of an AC electric power system is defined as the ratio of the real power flowing to the load over the apparent power in the circuit,[1][2] and is a dimensionless number between 0 and 1… …   Wikipedia

  • Damping factor — The term damping factor can also refer to the damping ratio in any damped oscillatory system or in numerical algorithms. In audio system terminology, the damping factor gives the ratio of the rated impedance of the loudspeaker to the source… …   Wikipedia

  • Capacity factor — The net capacity factor of a power plant is the ratio of the actual output of a power plant over a period of time and its output if it had operated at full nameplate capacity the entire time. To calculate the capacity factor, total the energy the …   Wikipedia

  • Stress intensity factor — Stress Intensity Factor, K, is used in fracture mechanics to more accurately predict the stress state ( stress intensity ) near the tip of a crack caused by a remote load or residual stresses.It is a theoretical construct applicable to a… …   Wikipedia

  • Cognitive load — The term cognitive load is used in cognitive psychology to illustrate the load related to the executive control of working memory (WM). Theories contend that during complex learning activities the amount of information and interactions that must… …   Wikipedia

  • Intermittent energy source — An intermittent energy source is any source of energy that is not continuously available due to some factor outside direct control. The intermittent source may be quite predictable, for example, tidal power, but cannot be dispatched to meet the… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”